OPERATOR SAVES 2.38 DAYS OF DRILLING TIME, EQUATING TO A SAVINGS OF OVER $140,000 PER WELL
The DrillScan software analysis uncovered high friction factors caused by high wellbore tortuosity. Knowing this ahead of time allowed H&P to recommend that the operator lower the doglegs in the curve from 10 deg/100 t